Looking straight down on wide pitch pine floorboards in a Harrogate villa, sanded and oiled, the grain running across the frame

Old floors, sanded back to the grain

  1. Coarse
  2. Medium
  3. Fine
  4. Oiled

We find the floor under your carpet and bring it back, across Harrogate, with most of the dust in a sealed bag.

Book a floor survey

Under the carpet

“There's a good floor somewhere under this carpet, and nobody's seen it since the seventies.”

Drawing: the corner of a sitting room with the carpet folded back from the skirting, showing the old boards and five faults 1 2 3 4 5
  1. 1 Old wax, gone dark in the corner
  2. 2 Gloss paint round the edges, where an old rug sat
  3. 3 Black stains by the hearth
  4. 4 A gap you could post a coin through
  5. 5 The gripper strip, still nailed down with its tacks

And before anyone starts: dust in every cupboard for a month, and a week without the sitting room.

Back to the grain

The same oak woodblock, before and after.

Example
As found: bitumen through the joints, two blocks missing, loose ones lifting.
Example
As left: loose blocks re-bedded, gaps filled with matched oak, sanded and lacquered.

Rooms we have worked in

  • A Victorian hallway in Harrogate with sanded pitch pine boards and a runner rolled back

    Example week · Monday Carpet up, gripper and tacks out

  • A 1930s dining room with restored oak woodblock in herringbone

    Example week · Tuesday Sanded: three grits with the grain

  • A straight staircase with sanded pine treads, white painted risers and a turned mahogany newel

    Example week · Wednesday Gaps filled with pine slivers

  • An Edwardian bay window over wide engineered oak boards

    Example week · Thursday Sealed: the last coat on

  • A kitchen with pale engineered oak running under the island

    Example week · Friday In socks, about 24 hours after the last coat

Before the first pass, every nail is punched below the boards, so the drum never catches a head.

A softly blurred living room with bare boards and long curtains, used as a backdrop
  • A nail punch and hammer resting by a nail head sunk below the surface of a pine board
  • A glued pine sliver set in a gap between two boards, with a mallet and three spare slivers beside it
  • A pin moisture meter standing on its pins in a stack of new oak boards, its display dark
  • An edging sander at rest tight to a painted skirting, with its extraction hose clipped on
  • A reclaimed pine board against the fence of a mitre saw outside the back door, its fresh-cut end at the blade and sawdust on the patio
  • A wide flat brush resting on freshly oiled oak, with the wet edge of the hardwax oil visible along the grain
A doorway off the hall sealed with a zipped clear dust sheet, the extractor hose running out under it
The mobile dust extractor in a hallway with its sealed bag
Furniture wrapped and stacked in the next room with floor protection under it

How we work in a lived-in house

Our sanders run into a HEPA extractor, so most of the dust goes into a sealed bag, and doorways are zipped shut.

We work room by room, so the rest of the house stays yours.

floors brought back (sample)
2,400
coats as standard
3
hours to socks
24

How a floor comes back

  1. Survey and readings

    Free within 20 miles (sample), about 40 minutes: we lift a corner, take moisture readings and sand a test patch, then send a written price.

  2. Mend before sanding

    Nails punched, gripper and staples out, loose boards screwed to the joists, split ones swapped for reclaimed boards of the same width.

  3. Three grits, one direction

    A coarse pass takes off the old finish, two finer passes follow the grain, and corners are scraped by hand.

  4. Colour on a test board

    Your shortlist of finishes, brushed onto offcuts of your own floor, so you choose in your room's light.

  5. Coat by coat

    A sealer and two coats of water-based lacquer, or three thin coats of hardwax oil, with a HEPA vacuum and tack cloth between coats.

  6. Drying and care

    Socks after about 24 hours; furniture, lifted not dragged, after 48 hours; rugs after 7 days on lacquer or 14 on hardwax oil.

A finished oiled oak floor in an Edwardian bay-windowed front room, morning light across the boards from the bay

The floor under your Harrogate carpet, back to the grain and sealed.

Lift a corner by the skirting, take a photo, and we will tell you what is under there.

Book a floor survey

Services

  • A drum sander at rest at the end of two pale sanded stripes on an amber varnished pine floor
    01

    Floor sanding and refinishing

    Ends: gloss paint at the edges and black stains by the fireplace

  • Glued slivers drying in gaps between boards
    02

    Gap filling

    Ends: gaps you could post a coin through

  • Oak woodblocks laid out to be re-bedded
    03

    Parquet restoration

    Ends: loose blocks and bitumen in the joints

  • Wide engineered oak boards newly laid across a cleared room, a few spare boards stacked by the wall
    04

    Oak fitting

    Ends: a floor too thin to sand again

  • Three finish samples brushed onto offcuts
    05

    Oils and lacquers

    Ends: a week without the sitting room

  • 06

    Stair sanding

  • 07

    Board and joist repairs

  • 08

    Staining and colour matching

  • 09

    Screen and recoat

  • 10

    Skirting, thresholds and trims

  • 11

    Church, school and village halls

Prices by the square metre

Sample prices for Harrogate and 20 miles around, in 2026, before VAT.

We price after the survey; most jobs start here.

Sand and seal, three coats

From £28/m²

  • Nails punched below the surface, staples and carpet gripper lifted
  • Three grits with extraction on the drum sander and the edger
  • Corners scraped by hand where the edger cannot reach
  • A sealer and two coats of water-based lacquer, or three coats of hardwax oil
  • Your choice of finish tested on an offcut of your own floor first

Sample prices. Minimum charge £450 for a single small room. Thick paint, old bitumen or a stain add to the price.

Gap filling with pine slivers

From £16/m²

  • Slivers cut, glued into the wider gaps and planed flush
  • Resin and sawdust filler for fine gaps in boards that do not move
  • Split or rotten boards replaced with reclaimed boards of the same width, from £45 a board
  • Loose boards screwed to the joists and squeaks traced

Sample prices, on top of sanding. Gap filling is quoted per room after the survey.

Parquet restoration

From £36/m²

  • Loose blocks lifted, old bitumen scraped back, blocks re-bedded in flexible adhesive
  • Missing blocks matched from reclaimed oak and pine stock
  • Sanded on the diagonal, then along the room, so the pattern stays flat
  • Herringbone, basket weave and brick bond

Sample prices, including sanding and three coats. Larger areas of re-bedding are quoted separately.

Engineered oak, supplied and fitted

From £72/m²

  • Moisture readings on the subfloor before anything is ordered
  • Boards left to settle in the room for at least 48 hours before fitting
  • Floated on underlay, or glued down over underfloor heating
  • Solid oak secret-nailed to joists from £38 per square metre, fitting only

Sample prices. Skirting off and back on, thresholds and door trimming are listed in the quote.

The people who will be in your house

The same crew comes back each day until your floor is finished.

Ellis started Knotwood in 2011. There are now six on the floor and two in the office (sample).

On the floor

  • A grey drum sander at rest, its hose coiled beside it

    Ellis Hardcastle

    Founder and lead sander

    Lifts the first corner on most surveys and runs the big drum sander.

  • A short run of oak herringbone blocks with a chisel and a mallet beside them

    Priya Walsh

    Parquet and repairs

    Re-beds loose woodblock and fills the gaps with slivers of pine.

  • A tape measure and pencil resting on a stack of engineered oak boards

    Josh Kettlewell

    Oak fitter

    Fits solid and engineered oak once the boards have rested in the room.

  • A row of finish samples on oak offcuts with a flat brush lying across them

    Martha Oyelaran

    Finishes and colour

    Tests every finish on an offcut of your own floor before it goes down.

  • An edging sander resting on its stand with its hose

    Callum Reay

    Sander

    Takes the edger round the skirting and scrapes the corners by hand.

  • A cabinet scraper and a mallet lying on an open canvas tool roll, three chisels in its pockets

    Sam Tate

    Apprentice

    Learning the trade on the hand scraper, the edger and the tool roll.

In the office

  • An open survey diary, a pin moisture meter and a small square of oiled oak

    Hannah Brook

    Bookings and surveys

    Books the surveys. Sanding is usually booked three to five weeks ahead, longer before Christmas.

  • A tape measure, a clipboard holding a pencil floor plan and a flat pencil

    Liam Fothergill

    Estimator

    Measures each room at the survey and writes the price after it.

Came in with, went home with

Finished: a pitch pine landing in Harrogate, sanded and oiled
We lifted a corner of the carpet and there it was. Now it is the first thing anyone mentions.
Came in with
‘There's a good floor somewhere under this carpet, and nobody's seen it since the seventies.’
Example review · Victorian villa, Harrogate
I braced myself for the dust. There wasn't any to speak of, and the doorways stayed zipped shut.
Came in with
‘Last time we had work done the dust was in every cupboard for a month.’
Example review · 1930s semi, Knaresborough
The draught by the sofa has gone, and you can't see where the gaps were.
Came in with
‘You could post a coin through the gaps between the boards.’
Example review · Terrace, Ripon

Questions people ask on the doorstep

Sanding

Will there be much dust?

Very little in the air. The sanders run into a HEPA extractor, so most of it ends up in a sealed bag, and doorways are zipped shut.

Can my floor be sanded at all?

Solid boards and woodblock nearly always. Engineered boards if the wear layer is 4 mm or thicker. Laminate and thin veneers cannot; we check at the survey.

Can you take out the black marks and dog scratches?

Scratches and most water rings sand out. Deep black stains go into the fibres: we test one, and if it stays, swap the board for a matched one.

What about the old gloss paint round the edges?

It comes off with the edger and a scraper. Paint from before about 1970 is tested for lead first and lifted with a stripper, never dry-sanded.

We can't be without the sitting room for a week. How long is it out of use?

Socks after about 24 hours, furniture (lifted, not dragged) after 48; rugs wait 7 days on lacquer and 14 on hardwax oil while the finish cures.

Finishes and new oak

Oil or lacquer?

Hardwax oil soaks in, looks softer and patches in one spot. Water-based lacquer sits on top and wears harder in kitchens and halls. We test both on your boards.

Solid or engineered over underfloor heating?

Engineered: it moves far less with heat. We glue it down and keep the floor's surface below about 27°C, as most board makers ask.

Why do the boards sit in the house first?

Wood settles to the room's moisture, so boards rest in the room for at least 48 hours, longer for solid oak, or gaps and cupping follow.

Booking

Why can't you price it over the phone?

Nobody knows what is under the carpet until a corner is lifted. After the survey you get a written price; sanding and sealing starts from £28 per m2, minimum £450 (sample, 2026, before VAT).

Is the survey free?

Yes, within 20 miles of Harrogate (sample): about 40 minutes, with a small test patch.

Your old floor back, room by room

Line map: Knotwood's workshop on Hornbeam Park, Harrogate, with a 20-mile circle reaching Ripon, Pateley Bridge, Otley, Wetherby and Boroughbridge HarrogateKnaresboroughRiponPateley BridgeOtleyWetherbyBoroughbridgeLeeds

Our workshop is on Hornbeam Park, Harrogate, with the sanders and the offcut store.

We cover about 20 miles around Harrogate: Knaresborough, Ripon, Pateley Bridge, Otley, Wetherby and the villages between. Surveys are by appointment, Monday to Friday, and on Saturdays by arrangement.

01632 960641
floors@knotwood.example

This demo sends nothing. Privacy notice

This is a demo form: with JavaScript off it checks the fields and sends nothing.

The Knotwood van outside the workshop, its side door open on racks of sanding belts